MACE Qatar – SUEZ SAS JV Commencing Qatar West Drainage O&M Framework
MACE Qatar is proud to partner with SUEZ SAS in this significant Joint Venture. Under the direction of our client, Ashghal. As we mobilize for the O&M of the Qatar West Catchment Zone, We are committed to demonstrating continuous excellence, driving infrastructure resilience through advanced operational methodologies and innovation that supports Ashghal’s corporate strategy, ensuring our developments align perfectly with the Qatar National Vision.
A New Era for Qatar West: MACE Qatar – SUEZ SAS JV Launches Operations
MACE Qatar is delighted to partner with SUEZ SAS, creating a powerhouse team dedicated to serving our client, Public Works Authority ‘Ashghal’ – Qatar, on the new Drainage O&M Framework for the Qatar West Catchment Zone.
With full confidence and a shared vision for the future, we have mobilized to manage one of the country's most vital distinct zones. Our scope encompasses the operation and maintenance of 1,375 km of Foul Sewer Network, 1,351 km of Surface & Ground Water Network, and 213 km of Treated Water Network, alongside Doha West STW, key treatment facilities and 43 pumping stations.
Our mission is clear: to integrate technical innovation into every layer of operation. By leveraging advanced engineering and smart monitoring, we aim to set new benchmarks in service delivery and sustainability.
We are honored by this opportunity to demonstrate our continuous excellence and alignment with the progressive vision of Ashghal and the State of Qatar.
#Engineering #JointVenture #MACE #SUEZ #Qatar #Asghal #PublicWorks